24 June 2006
Working Party Report
Longhoughton Goods Yard - TS, BS, DMS, BC, continuation of general tasks as required, Tom had arranged for Sandy Frater to deliver some soil/fill from a building site in Longhoughton to the goods yard. Dave dismantled a 30ft panel ready to enable to components to be used to extend road #1 so the crane can be moved southwards. A possible new volunteer popped in to introduce themselves.
17 June 2006
Working Party Report
Longhoughton Goods Yard - TS, continuation of general tasks as required, Tom cleaned up some more of the rail crane, and had a go at dismantling the Jones
3 June 2006
Working Party Report
Wooler - BS, DMS, moving track components from Wooler to Longhoughton, Bit of a mix up today, it was planned to move the sleepers, etc. down from Wooler but the transport did not turn up. The two 323s were checked over and the drive chains lubricated, and some more of the Ruston 200DE was primed.
1 June 2006