2 September 2006
Working Party Report
Longhoughton Goods Yard - BS, DMS, RJ, TS, IC, KSW, MH, continuation of general tasks as required, Baz and Dave arrived just after nine and set about checking over 37995, checking diesel, oil, and coolant levels. Roland arrived soon after and continued his assault on the crane. Tom continued preparing the McConnell power-arm for use. Baz, Dave and Ian set out more of the “trolley line”. A new volunteer, Mark, dropped in and helped Kay to de-cement the 165DE. The rain was set in for the day though, and 37995 was failed with a wheelslip fault, so an early finish.
No Comments »
No comments yet.
RSS feed for comments on this post. | TrackBack URI
Leave a comment
You must be logged in to post a comment.