9 September 2006
Working Party Report
Longhoughton Goods Yard and Wooler - BS, RJ, TS, IC, SY, MH, DT, KSW, BC , continuation of general tasks as required, Everyone met up at Longhoughton Baz, Mark, Tom, Scott to Wooler went morning - bits of points disconnected so rail can all now be lifted to Longhoughton. At LGY Roland continues to attack crane. Kay, Dave T working on 165DE assisted by Wooler party on return. Two angle grinders with large wire brushes making considerably improvement on rust removal and start made on red-oxide. TMS, BC hope to bring wooden sleepers and chairs down this week and rail when transport arranged.