4 November 2006

Working Party Report

Category: Longhoughton — dmshell @ 12:00 am

see text - BS, DMS, KSW, MH, RJ, DT , general, A team were along the track bed; Baz and Dave on the Cawledge Viaduct with chainsaws removing scrub and Kay near the A1 trying to locate the gas pipe. We popped back to Longhoughton about 2ish joining the others, to find the site once again busy with Network Rail, and their contractors. Parking was at a premium! Roland continued to concentrate on the crane, and Mark and Dave T performed a general tidy of the site, including a litter sweep. Quip was lifted slightly on hand pump, side plate under deadmans loosened ready to check wiring in there sometime.