25 August 2007

Working Party Report

Category: Longhoughton — dmshell @ 12:00 am

Longhoughton Goods Yard - BS, DMS, DT, TS, IC, KSW, RJ, tidying access road and yard; moving materials; laying out sidings; cleaning the Mk 1 roof; rubbing down Mk 1 sides; sweeping glass shards out the Mk 2s; covering window apatures on Mk 2s; check over rail crane, Baz continued painting the interior of the Mark 1, and was joined and assisted by Big Dave. Dave & Ian popped over to the cottages to collect materials for transfer to Longhoughton, on return the “”grey water”" pipe on the mk 1 was extended. They also swapped out some more materials on road 1 to give more useable siding space. Tom undertook some more refubishment on Scarth. Roland worked on the checking over of the crane’s gears. Kay contined tidying up the Mk 2s and also undertook some beutification to the Ruston 165DE.

No Comments »

No comments yet.

RSS feed for comments on this post. | TrackBack URI

Leave a comment

You must be logged in to post a comment.

Bad Behavior has blocked 123 access attempts in the last 7 days.