6 May 2008

Working Party Report

Category: Longhoughton — dmshell @ 6:19 pm

Baz was up and had used the Atlas to grade off the South end of the site. Temporary fencing has been erected along the original fence line; this is to help appease safety fears and will be taken down again when a method of recovering the remaining concrete sleepers is agreed with Network Rail. Various small P-Way material have been recovered from the old pile and moved down to the new stocking out area – they will still require sorting. The Ruston 48DS has been moved to the far south of road 1. Various other bits of site beautification were carried out.

(more…)