24 June 2006
Working Party Report
Longhoughton Goods Yard - TS, BS, DMS, BC, continuation of general tasks as required, Tom had arranged for Sandy Frater to deliver some soil/fill from a building site in Longhoughton to the goods yard. Dave dismantled a 30ft panel ready to enable to components to be used to extend road #1 so the crane can be moved southwards. A possible new volunteer popped in to introduce themselves.